Sewage Treatment Plant Waterproofing
Hydrotrident Coatings (OPC) Pvt. Ltd.
Procedure for sewage treatment waterproofing
- Chipping of all uneven surfaces to make the surface smooth.
- Grinding the surface to make it free of any undulations and preparing the surface for water proofing
- Haunching the bottom of the tank with a repair mortar.
- Negative pressure grouting – Drilling holes with a spacing of 1mtr between each hole, to form a grid system . The spacing will differ based on structure conditions.
- Inserting sockets and packing them with a special mortar system
- Negative pressure grouting using a cementitious grout and a high-pressure grouting machine.
- On completion of negative pressure grouting apply the first coat of a suitable waterproofing compound and allow it to dry.
- Applying two more coats of a suitable waterproofing compound and allowing it to dry.
- Once the coat is dry, a smooth coat of food-grade solvent-free epoxy is applied.
- Ponding the underground water tank for a period of seventy-two hours to check for any leakages.